Table · NCC 2025 Volume One
Table J3D7t Metal-framed flat, skillion or cathedral roof — minimum Total R-Value to account for thermal bridging
Part J3 Elemental provisions for a Class 4 part of a building
| Ceiling insulation R-Value from Tables J3D7a to J3D7r, and J3D7(1)(f) as applicable | Minimum Total R-Value to account for thermal bridging: heat flow down | Minimum Total R-Value to account for thermal bridging: heat flow up |
|---|---|---|
| 1.0 | 1.40 | 1.32 |
| 1.5 | 1.86 | 1.78 |
| 2.0 | 2.29 | 2.21 |
| 2.5 | 2.71 | 2.63 |
| 3.0 | 3.11 | 3.02 |
| 3.5 | 3.31 | 3.22 |
| 4.0 | 3.66 | 3.57 |
| 4.5 | 3.98 | 3.90 |
| 5.0 | 4.32 | 4.22 |
| 5.5 | 4.63 | 4.53 |
| 6.0 | 4.93 | 4.82 |
Table Notes
Minimum Total R-Values are in-situ values. They account for compression of insulation.
Direction of heat flow must be determined in accordance with Table J3D7v.
Table for J3D7 Roofs and ceilings of a Class 4 part of a building
Same wording in NCC 2022 Volume One. See NCC 2022 Volume One Table J3D7t.