Table · NCC 2022 Volume One
Table J3D7s Metal-framed pitched roof with horizontal ceiling — minimum Total R-Value of ceiling to account for thermal bridging
| Ceiling insulation R-Value from Tables J3D7a to J3D7r and J3D7(1)(f) as applicable | Minimum Total R-Value to account for thermal bridging |
|---|---|
| 1.5 | 1.38 |
| 2.0 | 1.74 |
| 2.5 | 2.09 |
| 3.0 | 2.43 |
| 3.5 | 2.63 |
| 4.0 | 2.95 |
| 4.5 | 3.27 |
| 5.0 | 3.59 |
| 5.5 | 3.91 |
| 6.0 | 4.23 |
Table Notes
The Total R-Value calculation only includes the ceiling frame, insulation and ceiling lining. It is not to include the internal air films, roof space or roof lining.
Minimum ceiling Total R-Values are in-situ values. They account for compression of insulation.
Same wording in NCC 2025 Volume One. See NCC 2025 Volume One Table J3D7s.