Deemed-to-Satisfy Provision · NCC 2022 Volume One

F7D3 Determination of airborne sound insulation ratings

Part F7 Sound transmission and insulation · NCC 2019: NT F5.2, F5.2

Open F7D3 on NCC Online ↗
Varied in NT. Check the variation for your state.

A form of construction required to have an airborne sound insulation rating must—

have the required value for weighted sound reduction index (Rw) or weighted sound reduction index with spectrum adaptation term (Rw + Ctr) determined in accordance with AS/NZS ISO 717.1 using results from laboratory measurements; or

comply with Specification 28.

Changed in NCC 2025 (minor wording). See NCC 2025 Volume One F7D3, or show what changed.

A form of construction required to have an airborne sound … spectrum adaptation term (Rw + Ctr) determined in accordance with AS/NZS AS ISO 717.1 using results from laboratory measurements; or comply with Specification 28.

Removed words are struck through; added words are highlighted. Comparison of the text only.

Can't meet F7D3? A Performance Solution must meet the Performance Requirements it satisfies: F7P1, F7P2, F7P3, F7P4. Start a Performance Solution →

State and territory variations all clauses side by side →

Defined terms used