Deemed-to-Satisfy Provision · NCC 2022 Volume One

J3D8 External walls of a sole-occupancy unit of a Class 2 building or a Class 4 part of a building

Part J3 Elemental provisions for a sole-occupancy unit of a Class 2 building or a Class 4 part of a building

Open J3D8 on NCC Online ↗
Varied in NSW. Check the variation for your state.

(1) The Total R-Value of an external wall—

in climate zones 1, 2, 3, 5 and 6—

where the ratio of the area of opaque external walls to the floor area of the sole-occupancy unit is less than 20%, must be at least R1.15; and

where the ratio of the area of opaque external walls to the floor area of the sole-occupancy unit is greater than or equal to 20% but less than 35%, must be at least R2.04; and

where the ratio of the area of opaque external walls to the floor area of the sole-occupancy unit is greater than or equal to 35%, must be at least R2.24; and

in climate zones 4, 7 and 8, must be at least R2.24.

(2) The Total R-Value of an external wall must be determined in accordance with—

for a spandrel panel in a curtain wall system, in accordance with Specification 38; and

for all other walls, in accordance with AS/NZS 4859.2.

(3) The solar absorptance of an external wall must—

in climate zones 1 to 6, be in accordance with Table J3D8a; and

in climate zones 7 and 8, be in accordance with Table J3D8b.

Table J3D8a Solar absorptance – climate zones 1 to 6

Climate zone

Opaque external wall to net floor area ratio

Permitted solar absorptance

1 and 3

< 45%

≤ 0.8

≥ 45%

≤ 0.35

2

< 35%

Any

≥ 35%

Any, or ≤ 0.35, if shading device overhang is < 300 mm

4 and 5

< 45%

Any

≥ 45%

≤ 0.35, if shading device overhang is < 1500 mm

6

Any

Any

Table J3D8b Solar absorptance – climate zones 7 and 8

Opaque external wall to net floor area ratio

Shading device overhang (mm)

≥ 0 to < 600

≥ 600 to < 900

≥ 900 to < 1200

≥ 1200

< 20%

Any

Any

≥ 0.4

X

≥ 20% to < 35%

Any

Any

X

X

≥ 35% to < 45%

Any

≥ 0.4

X

X

≥ 45%

Any

≥ 0.6

X

X

Table Notes

X = not permitted

Tables

Same wording in NCC 2025 Volume One. See NCC 2025 Volume One J3D8.
Can't meet J3D8? A Performance Solution must meet the Performance Requirements it satisfies: J1P1, J1P2, J1P3, J1P4. Start a Performance Solution →

State and territory variations all clauses side by side →

Defined terms used