Table J3D7u Metal-framed flat, skillion or cathedral roof – thermal bridging mitigation
| Minimum ceiling R-Value from Tables J3D7a to J3D7r, and J3D7(1)(f) as applicable | Option 1– increase insulation between roof frame members to specified minimum R-Value | Option 2 – add a layer of continuous insulation with specified minimum R-Value above or below the roof frame members |
|---|---|---|
| 1.0 | 1.5 | 0.13 |
| 1.5 | 2.5 | 0.30 |
| 2.0 | 3.5 | 0.30 |
| 2.5 | 5.0 | 0.40 |
| 3.0 | 6.0 | 0.60 |
| 3.5 | X | 0.60 |
| 4.0 | X | 0.60 |
| 4.5 | X | 0.60 |
| 5.0 | X | 0.60 |
| 5.5 | X | 0.60 |
| 6.0 | X | 0.60 |
Table Notes
Minimum R-Values are in-situ values. They account for compression of insulation.
X= not permitted.
Same wording in NCC 2025 Volume One. See NCC 2025 Volume One Table J3D7u.