Table · NCC 2022 Volume One
Table J3D7t Metal-framed flat, skillion or cathedral roof — minimum Total R-Value to account for thermal bridging
| Ceiling insulation R-Value from Tables J3D7a to J3D7r, and J3D7(1)(f) as applicable | Minimum Total R-Value to account for thermal bridging: heat flow down | Minimum Total R-Value to account for thermal bridging: heat flow up |
|---|---|---|
| 1.0 | 1.40 | 1.32 |
| 1.5 | 1.86 | 1.78 |
| 2.0 | 2.29 | 2.21 |
| 2.5 | 2.71 | 2.63 |
| 3.0 | 3.11 | 3.02 |
| 3.5 | 3.31 | 3.22 |
| 4.0 | 3.66 | 3.57 |
| 4.5 | 3.98 | 3.90 |
| 5.0 | 4.32 | 4.22 |
| 5.5 | 4.63 | 4.53 |
| 6.0 | 4.93 | 4.82 |
Table Notes
Minimum Total R-Values are in-situ values. They account for compression of insulation.
Direction of heat flow must be determined in accordance with Table J3D7v.
Same wording in NCC 2025 Volume One. See NCC 2025 Volume One Table J3D7t.