Table · NCC 2022 Volume One

Table J6D9a Piping — Minimum insulation R-Value

Part J6 Air-conditioning and ventilation

Open Table J6D9a on NCC Online ↗
Fluid temperatureMinimum insulation  R-Value nominal pipe diameter ≤ 40 mmMinimum insulation R-Value — nominal pipe diameter > 40 mm and ≤ 80 mmMinimum insulation R-Value — nominal pipe diameter between > 80 mm and ≤ 150 mmMinimum insulation R-Value — nominal pipe diameter > 150 mm
Low temperature chilled — ≤ 2°C1.31.72.02.7
Chilled — > 2°C but ≤ 20°C1.01.52.02.0
Heated — > 30°C but ≤ 85°C1.71.71.71.7
High Temperature heated — > 85°C2.72.72.72.7

Table Notes

The minimum required R-Value may be halved for piping penetrating a structural member.

Table for J6D9 Pipework insulation

Same wording in NCC 2025 Volume One. See NCC 2025 Volume One Table J6D9a.

Defined terms used