Deemed-to-Satisfy Provision · NCC 2025 Volume Three

B1D1 Deemed-to-Satisfy Provisions

Part B1 Cold water services · NCC 2019: B1.1

Open B1D1 on NCC Online ↗

(1) Performance Requirement B1P1 is satisfied if the cold water service is connected to—

the Network Utility Operator’s drinking water supply; or

an alternative drinking water supply.

(2) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B1P2 to B1P7 are satisfied by complying with B1D2 to B1D6.

(3) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.

Changed since NCC 2022 (minor wording). See NCC 2022 Volume Three B1D1, or show what changed.

(1) Performance RequirementB1P1 Requirement B1P1 is satisfied if the cold water service is connected to … Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B1P2 to B1P6 B1P7 are satisfied by complying with B1D2 to B1D6. (3) Where … be determined in accordance with A2G2(3) and A2G4(3) as applicable.

Removed words are struck through; added words are highlighted. Comparison of the text only.

Clauses referred to

Defined terms used