Deemed-to-Satisfy Provision · NCC 2025 Volume Three
B3D1 Deemed-to-Satisfy Provisions
Part B3 Non-drinking water services · NCC 2019: B3.1
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B3P1 to B3P8 are satisfied by complying with B3D2 and B3D5.
(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Changed since NCC 2022 (minor wording). See NCC 2022 Volume Three B3D1, or show what changed.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements B3P1 to B3P7 B3P8 are satisfied by complying with B3D2 and B3D5. (2) Where … be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Removed words are struck through; added words are highlighted. Comparison of the text only.
Clauses referred to
- B3P1 Non-drinking water supply
- B3P8 Water efficiency
- B3D2 Distribution of non-drinking water
- B3D5 Water efficiency
- A2G2 Performance Solution
- A2G4 A combination of solutions