Deemed-to-Satisfy Provision · NCC 2025 Volume Three
B5D1 Deemed-to-Satisfy Provisions
Part B5 Cross-connection control · NCC 2019: B5.1
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirement B5P1 is satisfied by complying with B5D2 to B5D7.
(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Changed since NCC 2022 (minor wording). See NCC 2022 Volume Three B5D1, or show what changed.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirement B5P1 is satisfied by complying with B5D2 to B5D6. B5D7. (2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Removed words are struck through; added words are highlighted. Comparison of the text only.
Clauses referred to
- B5P1 Contamination control
- B5D2 Drinking water service
- B5D7 Cross-connection hazards
- A2G2 Performance Solution
- A2G4 A combination of solutions