Deemed-to-Satisfy Provision · NCC 2025 Volume One

C2D1 Deemed-to-Satisfy Provisions

Part C2 Fire resistance and stability · NCC 2019: C1.0

Open C2D1 on NCC Online ↗
Varied in SA. Check the variation for your state.

(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements C1P1 to C1P9 are satisfied by complying with—

C2D2 to C2D15, C3D2 to C3D15 and C4D2 to C4D17; and

in a building containing an atrium, Part G3; and

for a building containing an occupiable outdoor area, Part G6; and

for additional requirements for Class 9b buildings, Part I1; and

for farm sheds, Part I3.

(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.

Same wording in NCC 2022 Volume One. See NCC 2022 Volume One C2D1.

State and territory variations all clauses side by side →

Clauses referred to

Defined terms used