Deemed-to-Satisfy Provision · NCC 2025 Volume One
C3D1 Deemed-to-Satisfy Provisions
Part C3 Compartmentation and separation · NCC 2019: C2.0
Varied in SA. Check the variation for your state.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements C1P1 to C1P9 are satisfied by complying with—
C2D2 to C2D15, C3D2 to C3D15 and C4D2 to C4D17; and
in a building containing an atrium, Part G3; and
for a building containing an occupiable outdoor area, Part G6; and
for additional requirements for Class 9b buildings, Part I1; and
for farm sheds, Part I3.
(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Same wording in NCC 2022 Volume One. See NCC 2022 Volume One C3D1.
State and territory variations all clauses side by side →
Clauses referred to
- C1P1 Structural stability during a fire
- C1P9 Fire brigade access
- C2D2 Type of construction required
- C2D15 Fixing of bonded laminated cladding panels
- C3D2 Application of Part
- C3D15 Public corridors in Class 2 and 3 buildings
- C4D2 Application of Part
- C4D17 Columns protected with lightweight construction to achieve an FRL
- A2G2 Performance Solution
- A2G4 A combination of solutions