Deemed-to-Satisfy Provision · NCC 2025 Volume One

C3D3 General floor area and volume limitations

Part C3 Compartmentation and separation · NCC 2019: C2.2

Open C3D3 on NCC Online ↗

(1) The size of any fire compartment or atrium in a Class 5, 6, 7, 8 or 9 building must not exceed the relevant maximum floor area nor the relevant maximum volume set out in Table C3D3 and C3D6 except as permitted in C3D4.

(2) A part of a building which contains only heating, ventilating, or lift equipment, water tanks, or similar service units is not counted in the floor area or volume of a fire compartment or atrium if it is situated at the top of the building.

(3) In a building containing an atrium, the part of the atrium well bounded by the perimeter of the openings in the floors and extending from the level of the first floor above the atrium floor to the roof covering is not counted in the volume of the atrium for the purposes of this clause.

Table C3D3 Maximum size of fire compartments or atria

Classification

Type A construction

Type B construction

Type C construction

5, 9b or 9c

Max floor area —8 000 m2

Max floor area —5 500 m2

Max floor area —3 000 m2

Max volume —48 000 m3

Max volume —33 000 m3

max volume —18 000 m3

6, 7, 8 or 9a (except for patient care areas)

Max floor area —5 000 m2

Max floor area —3 500 m2

Max floor area —2 000 m2

Max volume —30 000 m3

Max volume —21 000 m3

Max volume —12 000 m3

Table Notes

See C3D6 for maximum size of compartments in patient care areas in Class 9a health-care buildings.

Tables

Same wording in NCC 2022 Volume One. See NCC 2022 Volume One C3D3.
Can't meet C3D3? A Performance Solution must meet the Performance Requirements it satisfies: C1P1, C1P2, C1P3, C1P4, C1P5, C1P6, C1P7, C1P8, C1P9. Start a Performance Solution →

Clauses referred to

Defined terms used