Deemed-to-Satisfy Provision · NCC 2025 Volume One

D3D7 Smoke lobbies

Part D3 Construction of exits · NCC 2019: D2.6

Open D3D7 on NCC Online ↗

A smoke lobby required by D2D12 must—

have a floor area not less than 6 m2; and

be separated from the occupied areas in the storey by walls which are impervious to smoke, and—

have an FRL of not less than 60/60/– (which may be fire-protective grade plasterboard, gypsum block with set plaster, face brickwork, glass blocks or glazing); and

extend from slab to slab, or to the underside of a ceiling with a resistance to the incipient spread of fire of 60 minutes which covers the lobby; and

any construction joints between the top of the walls and the floor slab, roof or ceiling must be smoke sealed with intumescent putty or other suitable material; and

at any opening from the occupied areas, have smoke doors complying with S12C3 and S12C4 except that the smoke sensing device need only be located on the approach side of the opening; and

be pressurised as part of the exit if the exit is required to be pressurised under E2D4.

New in NCC 2025. No D3D7 in NCC 2022 Volume One; it may have moved or been renumbered.
Can't meet D3D7? A Performance Solution must meet the Performance Requirements it satisfies: D1P1, D1P2, D1P3, D1P4, D1P5, D1P6, D1P8, D1P10, D1P9. Start a Performance Solution →

Clauses referred to

Defined terms used