Deemed-to-Satisfy Provision · NCC 2025 Volume One
E1D15 Fire control centres
Part E1 Fire fighting equipment · NCC 2019: E1.8
A fire control centre facility in accordance with Specification 19 must be provided for—
a building with an effective height of more than 25 m; and
a Class 6, 7, 8 or 9 building with a total floor area of more than 18 000 m2.
Same wording in NCC 2022 Volume One. See NCC 2022 Volume One E1D15.