J9D3 Facilities for energy monitoring
Part J9 Energy monitoring and on-site distributed energy resources · NCC 2019: J8.3
(1) A building or sole-occupancy unit with a floor area of more than 500 m2 must have energy meters configured to record the time-of-use consumption of gas and electricity.
(2) A building with a floor area of more than 2 500 m2 must have energy meters configured to enable individual time-of-use energy data recording, in accordance with (3), of—
air-conditioning plant including, where appropriate, heating plant, cooling plant and air handling fans; and
artificial lighting; and
appliance power; and
central hot water supply; and
internal transport devices including lifts, escalators and moving walkways where there is more than one serving the building; and
on-site renewable energy equipment; and
on-site electric vehicle charging equipment; and
on-site battery systems; and
other ancillary plant.
(3) Energy meters required by (2) must be interlinked by a communication system that collates the time-of-use energy data to a single interface monitoring system where it can be stored, analysed and reviewed.
(4) The provisions of (2) do not apply to energy meters serving individual sole-occupancy units with a floor area of less than 2 500 m2.
(5) Where a building has an Environmental Management Information System facility it must record, in addition to J9D3(2)(a) to (i), on a 5 minute time interval basis—
the energy use of any piece of equipment predicted to consume more than 5% of total building annual energy use; and
entering and leaving temperatures and energy use for each chiller, heat pump, electric heater or hot water heater used in air-conditioning; and
the temperature of all internal air-conditioning zones; and
the water flow and return temperature of chilled and heated water loops; and
the external temperature and humidity local to the building; and
measurement of internal carbon dioxide and car park pollutant levels, where these are used for controlling fan speed or outside air quantities; and
total instantaneous building electricity demand, recorded as an average over every 5 minutes of building operation; and
the start/stop command value and speed of air-conditioning and mechanical ventilation fans and pumps and associated system pressure measurement and set point; and
the damper command for economy cycle and ventilation dampers; and
the damper or valve command for energy reclaim equipment.
(6) The Environmental Management Information System in (5) must—
allow demand management control of the building’s—
renewable energy system, including any battery energy storage system installed; and
lighting system; and
air-conditioning and ventilation system; and
electric vehicle charging equipment; and
include an operational interface that enables remote users to visualise system data and operational status; and
allow for the visualisation of data in a graphical format, including the ability to compare individual data streams integrated over time periods and in time series; and
be able to provide bulk downloads of at least 2 years of historic time series data to users; and
allow scheduling, supervisory level setpoint override and modulation set-back of the air-conditioning and ventilation system; and
incorporate monitoring and verification functionality with the capability to—
provide monitoring and verification of a change in energy use in accordance with the International Performance Measurement and Verification Protocol Options B and C; and
automatically determine an energy performance baseline from historical building data and weather data; and
compare building performance against the baseline, both numerically and graphically; and
provide forecasts of the building’s renewable energy production.
(7) The requirements of (5) and (6) do not apply to services that consume less than 5% of the building’s total annual energy consumption.
Notes
An Environmental Management Information System that complies with J9D3(5) and (6) and records data as required by J9D3(2)(a) to (i) satisfies the requirement for ‘energy meters’ in J9D3(2).
Changed since NCC 2022. See NCC 2022 Volume One J9D3, or show what changed.
(1) A building or sole-occupancy unit with a floor area … provisions of (2) do not apply to energy meters serving — a Class 2 building where the total floor area of the common areas is less than 500 m2; or individual sole-occupancy units with a floor area of less than 2 500 m2. (5) Where a building has an Environmental Management Information System facility it must record, in addition to J9D3(2)(a) to (i), on a 5 minute time interval basis — the energy use of any piece of equipment predicted to consume more than 5% of total building annual energy use; and entering and leaving temperatures and energy use for each chiller, heat pump, electric heater or hot water heater used in air-conditioning; and the temperature of all internal air-conditioning zones; and the water flow and return temperature of chilled and heated water loops; and the external temperature and humidity local to the building; and measurement of internal carbon dioxide and car park pollutant levels, where these are used for controlling fan speed or outside air quantities; and total instantaneous building electricity demand, recorded as an average over every 5 minutes of building operation; and the start/stop command value and speed of air-conditioning and mechanical ventilation fans and pumps and associated system pressure measurement and set point; and the damper command for economy cycle and ventilation dampers; and the damper or valve command for energy reclaim equipment. (6) The Environmental Management Information System in (5) must — allow demand management control of the building’s — renewable energy system, including any battery energy storage system installed; and lighting system; and air-conditioning and ventilation system; and electric vehicle charging equipment; and include an operational interface that enables remote users to visualise system data and operational status; and allow for the visualisation of data in a graphical format, including the ability to compare individual data streams integrated over time periods and in time series; and be able to provide bulk downloads of at least 2 years of historic time series data to users; and allow scheduling, supervisory level setpoint override and modulation set-back of the air-conditioning and ventilation system; and incorporate monitoring and verification functionality with the capability to — provide monitoring and verification of a change in energy use in accordance with the International Performance Measurement and Verification Protocol Options B and C; and automatically determine an energy performance baseline from historical building data and weather data; and compare building performance against the baseline, both numerically and graphically; and provide forecasts of the building’s renewable energy production. (7) The requirements of (5) and (6) do not apply to services that consume less than 5% of the building’s total annual energy consumption. Notes An Environmental Management Information System that complies with J9D3(5) and (6) and records data as required by J9D3(2)(a) to (i) satisfies the requirement for ‘energy meters’ in J9D3(2).
Removed words are struck through; added words are highlighted. Comparison of the text only.