Part J9 Energy monitoring and on-site distributed energy resources
8 clauses · Open on NCC Online ↗
- J9D1 Deemed-to-Satisfy Provisions NSWWhere a Deemed-to-Satisfy Solution is proposed, Performance Requirements J1P1 to J1P4 are satisfied by complying with— J2D2; and J3D2 to J3D15; and…
- J9D2 Application of Part NSWThe Deemed-to-Satisfy Provisions of this Part do not apply— within a Class 4 part of a building; or to a Class 8 electricity network substation.
- J9D3 Facilities for energy monitoringA building or sole-occupancy unit with a floor area of more than 500 m2 must have energy meters configured to record the time-of-use consumption of…
- Table J9D4 Electric vehicle distribution board requirement for each storey of a carparkCarpark spaces per storey for electric vehicles | Electrical distribution boards required for electric vehicle charging per storey 0 - 9 | 0 10 - 24…
- J9D4 Facilities for electric vehicle charging equipmentSubject to (2), a carpark associated with a Class 3, 5, 6, 7b, 8 or 9 building must be provided with electrical distribution boards dedicated to…
- Table J9D5a Minimum solar photovoltaic system installed peak output (W) per m2 of conditioned space for buildings without gasBuilding Class | Climate zone 1 | Climate zones 2 to 7 | Climate zone 8 Class 5, 6, and 7 | 95 | 65 | 55 Class 3 and 9 | 70 | 40 | 35
- Table J9D5b Minimum solar photovoltaic system installed peak output (W) per m2 of conditioned space for buildings with gas, in addition to the requirements of J9D5(2)Building Class | Climate zones 1 and 3 | Climate zones 2 and 5 | Climate zones 4 and 6 | Climate zone 7 | Climate zone 8 Class 5, 6 and 7 | 0 | 0 |…
- J9D5 Facilities for solar photovoltaic and battery systemsThe main electrical switchboard of a building must contain at least 2 empty three-phrase circuit breaker slots and 4 DIN rail spaces labelled to…