Deemed-to-Satisfy Provision · NCC 2025 Volume One

J9D4 Facilities for electric vehicle charging equipment

Part J9 Energy monitoring and on-site distributed energy resources

Open J9D4 on NCC Online ↗

(1) Subject to (2), a carpark associated with a Class 3, 5, 6, 7b, 8 or 9 building must be provided with electrical distribution boards dedicated to electric vehicle charging—

in accordance with Table J9D4 in each storey of the carpark; and

labelled to indicate use for electric vehicle charging equipment.

(2) Electrical distribution boards dedicated to serving electric vehicle charging in a carpark must—

be fitted with a charging control system with the ability to manage and schedule charging of electric vehicles in response to total building demand; and

when associated with a Class 5 to 9 building, have capacity for each circuit to support an electric vehicle charger able to deliver a minimum of 12 kWh from 9:00 am to 5:00 pm daily; and

when associated with a Class 3 building, have capacity for each circuit to support an electric vehicle charger able to deliver a minimum of 48 kWh from 11:00 pm to 7:00 am daily; and

be sized to support the future installation of a 7 kW (32 A) type 2 electric vehicle charger in—

10% of car parking spaces associated with a Class 5 or 6 building; or

20% of car parking spaces associated with a Class 3, 7b, 8 or 9 building; and

contain space of at least 36 mm width of DIN rail per outgoing circuit for individual sub-circuit for individual sub-circuit electricity metering to record electricity use of electric vehicle charging equipment; and

be labelled to indicate the use of the space required by (f) is for the future installation of metering equipment.

Limitations

J9D4 does not apply to a stand alone Class 7a building.

Table J9D4 Electric vehicle distribution board requirement for each storey of a carpark

Carpark spaces per storey for electric vehicles

Electrical distribution boards required for electric vehicle charging per storey

0 - 9

0

10 - 24

1

25 - 48

2

49 - 72

3

73 - 96

4

97 - 120

5

121 - 144

6

145 - 168

7

Table Notes

Where there are more than 168 carpark spaces per storey, one additional distribution board must be provided for each additional 24 spaces or part thereof.

The number of distribution boards required is determined by application of J9D4(2)(d).

Tables

Changed since NCC 2022. See NCC 2022 Volume One J9D4, or show what changed.

(1) Subject to (2), a carpark associated with a Class 2, 3, 5, 6, 7b, 8 or 9 building must be … charging of electric vehicles in response to total building demand; and when associated with a Class 2 building, have capacity for each circuit to support an electric vehicle charger able to deliver a minimum of 12 kWh from 11:00 pm to 7:00 am daily; and when associated with a Class 5 to 9 building, … kW (32 A) type 2 electric vehicle charger in — 100% of the car parking spaces associated with a Class 2 building; or 10% of car parking spaces associated with a Class 5 … width of DIN rail per outgoing circuit for individual sub-circuit for individual sub-circuit electricity metering to record electricity use of electric vehicle charging … of metering equipment. Limitations J9D4 does not apply to a stand-alone stand alone Class 7a building. Table J9D4 Electric vehicle distribution board requirement … Carpark spaces per storey for electric vehicles Electrical distribution boards required for electric vehicle charging per storey 0 - 9 0 … be provided for each additional 24 spaces or part thereof. The number of distribution boards required is determined by application of J9D4(2)(d).

Removed words are struck through; added words are highlighted. Comparison of the text only.

Can't meet J9D4? A Performance Solution must meet the Performance Requirements it satisfies: J1P1, J1P2, J1P3, J1P4. Start a Performance Solution →

Defined terms used