Deemed-to-Satisfy Provision · NCC 2025 Volume One
J9D1 Deemed-to-Satisfy Provisions
Part J9 Energy monitoring and on-site distributed energy resources · NCC 2019: J8.0
Varied in NSW. Check the variation for your state.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements J1P1 to J1P4 are satisfied by complying with—
J2D2; and
(2) Where a Performance Solution is proposed, the relevant Performance Requirements must be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Changed since NCC 2022 (minor wording). See NCC 2022 Volume One J9D1, or show what changed.
(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements J1P1 … J6D2 to J6D13; and J7D2 to J7D9; and J8D2 to J8D4; J8D5; and J9D2 to J9D5. (2) Where a Performance Solution is … be determined in accordance with A2G2(3) and A2G4(3) as applicable.
Removed words are struck through; added words are highlighted. Comparison of the text only.
State and territory variations all clauses side by side →
Clauses referred to
- J1P1 Operational energy use and greenhouse gas emissions
- J1P4 Renewable energy, energy storage and electric vehicle charging
- J2D2 Application of Section J
- J3D2 Application of Part
- J3D15 Net equivalent energy usage for Class 4 part of building – home energy rating software
- J4D2 Application of Part
- J4D7 Floors
- J5D2 Application of Part
- J5D8 Evaporative coolers
- J6D2 Application of Part
- J6D13 Heat rejection equipment
- J7D2 Application of Part
- J7D9 Escalators and moving walkways
- J8D2 Application of Part
- J8D5 Spa pool heating and pumping
- J9D2 Application of Part
- J9D5 Facilities for solar photovoltaic and battery systems
- A2G2 Performance Solution
- A2G4 A combination of solutions