Deemed-to-Satisfy Provision · NCC 2022 Volume One

E2D8 Buildings not more than 25 m in effective height: Class 2 and 3 buildings and Class 4 part of a building

Part E2 Smoke hazard management · NCC 2019: Table E2.2a

Open E2D8 on NCC Online ↗

In a Class 2 and 3 building or part of a building, or Class 4 part of a building, if the building is not more than 25 m in effective height—

it must be provided with an automatic smoke detection and alarm system complying with Specification 20; and

where a required fire-isolated stairway serving the Class 2 or 3 parts also serves one or more storeys of Class 5, 6, 7 (other than an open-deck carpark), 8 or 9b parts—

the fire-isolated stairway, including any associated fire-isolated passageway or fire-isolated ramp, must be provided with an automatic air pressurisation system for fire-isolated exits in accordance with AS 1668.1; or

the Class 5, 6, 7 (other than an open-deck carpark), 8 and 9b parts must be provided with—

an automatic smoke detection and alarm system complying with Specification 20; or

a sprinkler system (other than a FPAA101D or FPAA101H system) complying with Specification 17; and

where a required fire-isolated stairway serving the Class 4 part also serves one or more storeys of Class 5, 6, 7 (other than an open-deck carpark), 8 or 9b parts—

a system complying with (b)(i) or (b)(ii) must be installed; or

a smoke alarm or detector system complying with Specification 20 must be provided except that alarms or detectors need only be installed adjacent to each doorway into each fire-isolated stairway (set back horizontally from the doorway by a distance of not more than 1.5 m) to initiate a building occupant warning system for the Class 4 part.

Notes

Refer to C3D15 for division of public corridors greater than 40 m in length.

Refer to E2D14 to E2D20 for specific provisions applicable to a Class 6 (in a fire compartment having a floor area of more than 2000 m2) and Class 9b building or part of a building.

Same wording in NCC 2025 Volume One. See NCC 2025 Volume One E2D8.
Can't meet E2D8? A Performance Solution must meet the Performance Requirements it satisfies: E2P1, E2P2. Start a Performance Solution →

Clauses referred to

Defined terms used