Deemed-to-Satisfy Provision · NCC 2022 Volume One

J3D9 Wall-glazing construction of a sole-occupancy unit of a Class 2 building or a Class 4 part of a building

Part J3 Elemental provisions for a sole-occupancy unit of a Class 2 building or a Class 4 part of a building

Open J3D9 on NCC Online ↗
Varied in NSW. Check the variation for your state.

(1) The Total System U-Value of wall-glazing construction that forms part of the external building fabric must not be greater than—

in climate zones 1 to 5, U2.2; or

in climate zone 6, U2.0; or

in climate zones 7 and 8, U1.4.

(2) The Total System U-Value of wall-glazing construction that forms part of the external building fabric must be calculated in accordance with Specification 37.

(3) Wall components of wall-glazing construction must achieve a minimum Total R-Value of—

where the wall is less than 80% of the area of the wall-glazing construction, R1.0; or

where the wall is 80% or more of the area of the wall-glazing construction, the value specified in Table J4D6a for a Class 3 building.

(4) In climate zones 1 to 6, the solar admittance of externally facing wall-glazing construction must be not greater than that shown in Table J3D9.

(5) In climate zones 7 and 8, glazing in a wall-glazing construction must have a Total System SHGC of at least 0.4.

(6) The solar admittance of a wall-glazing construction must be calculated in accordance with Specification 37.

(7) The solar absorptance of an external wall must be in accordance with J3D8(3).

Table J3D9 Maximum wall-glazing construction solar admittance

Climate zone

Eastern aspect solar admittance

Northern aspect solar admittance

Southern aspect solar admittance

Western aspect solar admittance

1

0.10

0.10

0.14

0.10

2

0.10

0.10

0.10

0.10

3

0.11

0.11

0.11

0.11

4

0.11

0.11

0.11

0.11

5

0.13

0.13

0.13

0.13

6

0.14

0.14

0.14

0.14

7

N/A

N/A

N/A

N/A

8

N/A

N/A

N/A

N/A

Tables

Changed in NCC 2025. See NCC 2025 Volume One J3D9, or show what changed.

(1) The Total System U-Value of wall-glazing construction that forms … area of the wall-glazing construction, the value specified in Table J4D6a J4D6b for a Class 3 building. (4) In climate zones 1 … construction must be not greater than that shown in Table J3D9. J3D 9. (5) In climate zones 7 and 8, glazing in a … a wall-glazing construction must be calculated in accordance with Specification 37. 37 as for a Class 3 building as required. (7) The solar absorptance of an external wall must be … 7 N/A N/A N/A N/A 8 N/A N/A N/A N/A

Removed words are struck through; added words are highlighted. Comparison of the text only.

Can't meet J3D9? A Performance Solution must meet the Performance Requirements it satisfies: J1P1, J1P2, J1P3, J1P4. Start a Performance Solution →

State and territory variations all clauses side by side →

Clauses referred to

Defined terms used