NCC 2022 Volume One
Northern Territory variations
34 NT variations to NCC 2022 Volume One: clauses replaced, added or deleted in Northern Territory. Search with NT variations.
- NT B1D4 Determination of structural resistance of materials and forms of constructionDelete clause B1D4 and insert NT B1D4 as follows: The structural resistance of materials and forms of construction must be determined in accordance…
- NT E1D10 Where sprinklers are required: Class 9a and 9c buildingsDelete clause E1D10 and insert NT E1D10 as follows: (1) In a Class 9a health-care building used as a residential care building, sprinklers are…
- NT F7D1 Deemed-to-Satisfy ProvisionsWhere a Deemed-to-Satisfy Solution is proposed, Performance Requirements F7P1 to F7P4 are satisfied by complying with NT F7D2 to NT F7D9. (2) Where…
- NT F7D2 Application of PartThe Deemed-to-Satisfy Provisions of this Part apply to Class 2 and 3 buildings and Class 9c aged care buildings.
- NT F7D3 Weighted sound reduction index: interpretationA form of construction required to have a certain weighted sound reduction index (RW) must— have the required value determined under AS/NZS ISO…
- NT F7D4 Sound insulation of floors between unitsA floor separating sole-occupancy units must have an RW not less than 45.
- NT F7D5 Sound insulation of walls between unitsA wall must have an RW not less than 45 if it separates— sole-occupancy units; or a sole-occupancy unit not within a Class 9c building from a plant…
- NT F7D6 Walls between a bathroom, sanitary compartment, laundry or kitchen and a habitable room in adjoining unitExcept for a Class 9c building, a wall separating a bathroom, sanitary compartment, laundry or kitchen in one sole-occupancy unit from a habitable…
- NT F7D7 Soil and waste pipes to be separatedIf a soil or waste pipe, including a pipe that is embedded in or passes through a floor, serves or passes through more than one sole-occupancy unit—…
- NT F7D8 Isolation of pumpsA flexible coupling must be used at the point of connection between the service pipes in a building and any circulating or other pump.
- NT F7D9 Walls between a bedroom and kitchen or laundry in a Class 9c buildingIn addition to NT F7D5, a wall separating a sole-occupancy unit in a Class 9c building from a kitchen or laundry must— for other than masonry, be…
- NT F7P1 Sound transmission through floorsFloors separating sole-occupancy units must provide insulation against the transmission of airborne and impact generated sound sufficient to prevent…
- NT F7P2 Sound transmission through wallsWalls separating— sole-occupancy units; or a sole-occupancy unit from a plant room, lift shaft, stairway, public corridor, public lobby or the like,…
- NT F7P3 Sound transmission through wall and floor penetrationsThe required sound insulation of floors and walls must not be compromised by the incorporation or penetration of a pipe or other service element.…
- NT F7P4 Sound transmission through walls in residential care buildingsWalls separating— sole-occupancy units; or a sole-occupancy unit from a kitchen, bathroom, sanitary compartment (not being an associated ensuite),…
- NT G1D2 Swimming poolsThis clause been deliberately left blank Barriers and fences for swimming pools are regulated by the Northern Territory of Australia Swimming Pool…
- NT G1P1 Swimming pool drainageThis clause been deliberately left blank
- NT G1P2 Swimming pool access and water recirculation systemsDelete clause G1P2 and insert NT G1P2 as follows: A swimming pool water recirculation system must incorporate safety measures to avoid entrapment…
- NT Part J1 Energy efficiency performance requirementsFor a Class 2 building and Class 4 part of a building, Section J is replaced with Section J of BCA 2009. For Class 3 and Class 5-9 buildings,…
- NT Part J2 Energy efficiencyFor a Class 2 building and Class 4 part of a building, Section J is replaced with Section J of BCA 2009. For Class 3 and Class 5-9 buildings,…
- NT Part J3 Elemental provisions for a sole-occupancy unit of a Class 2 building or a Class 4 part of a buildingFor a Class 2 building and Class 4 part of a building, Section J is replaced with Section J of BCA 2009. For Class 3 and Class 5-9 buildings,…
- NT Part J4 Building fabricFor a Class 2 building and Class 4 part of a building, Section J is replaced with Section J of BCA 2009. For Class 3 and Class 5-9 buildings,…
- NT Part J5 Building sealingFor a Class 2 building and Class 4 part of a building, Section J is replaced with Section J of BCA 2009. For Class 3 and Class 5-9 buildings,…
- NT Part J6 Air-conditioning and ventilationFor a Class 2 building and Class 4 part of a building, Section J is replaced with Section J of BCA 2009. For Class 3 and Class 5-9 buildings,…
- NT Part J7 Artificial lighting and powerFor a Class 2 building and Class 4 part of a building, Section J is replaced with Section J of BCA 2009. For Class 3 and Class 5-9 buildings,…
- NT Part J8 Heated water supply and swimming pool and spa pool plantFor a Class 2 building and Class 4 part of a building, Section J is replaced with Section J of BCA 2009. For Class 3 and Class 5-9 buildings,…
- NT Part J9 Energy monitoring and on-site distributed energy resourcesFor a Class 2 building and Class 4 part of a building, Section J is replaced with Section J of BCA 2009. For Class 3 and Class 5-9 buildings,…
- NT S4C3 Strengthened areaInsert NT clause S4C3 in clause S4C3 as follows: (1) Where a residential building of Class 2, 3, 9a or 9c, in Region C as defined by AS/NZS 1170.2,…
- NT S28C1 ScopeDelete clause S28C1 and insert NT S28C1 as follows: This Specification lists the weighted sound reduction index RW for some common forms of…
- NT S28C2 Construction deemed-to-satisfyDelete clause S28C2 and insert NT S28C2 as follows: The forms of construction listed in NT S28C3 are considered to have the RW stated in that clause…
- NT S28C3 RW applicable to constructionDelete clause S28C3 and insert NT S28C3 as follows: (1) Construction in accordance with the following has an RW of not less than 45: Walls — clay…
- NT S29C1 ScopeDelete clause S29C1 and insert NT S29C1 as follows: This Specification describes a method of test to determine the comparative resistance of walls…
- NT S29C2 Construction to be testedDelete clause S29C2 and insert NT S29C2 as follows: (1) The test is conducted on a specimen of prototype wall construction and on a specimen of one…
- NT S29C3 MethodDelete clause S29C3 and insert NT S29C3 as follows: (1) The wall constructions to be compared must be tested in accordance with AS 1191. (2) A…