Deemed-to-Satisfy Provision · NCC 2025 Volume One

D3D30 Timber stairways: Concession

Part D3 Construction of exits · NCC 2019: D2.25

Open D3D30 on NCC Online ↗

(1) Notwithstanding D3D3(a), timber treads, risers, landings and associated supporting framework within a required fire-isolated stairway or fire-isolated passageway may be constructed from fire-protected timber in accordance with C2D13 —

if the timber—

has a finished thickness of not less than 44 mm; and

has an average density of not less than 800 kg/m3 at a moisture content of 12%; and

subject to—

the building being protected throughout by a sprinkler system (other than a FPAA101D system) complying with Specification 17 which extends to within the fire-isolated enclosure; and

fire protection being provided to the underside of stair flights and landings located immediately above a landing level which—

is at or near the level of egress; or

provides direct access to a carpark.

(2) Fire protection required by (1) must be not less than one layer of 13 mm fire-protective grade plasterboard fixed in accordance with the system requirements for a fire-protective covering.

Same wording in NCC 2022 Volume One. See NCC 2022 Volume One D3D30.
Can't meet D3D30? A Performance Solution must meet the Performance Requirements it satisfies: D1P1, D1P2, D1P3, D1P4, D1P5, D1P6, D1P8, D1P10, D1P9. Start a Performance Solution →

Clauses referred to

Defined terms used