J6D4 Mechanical ventilation system control
Part J6 Air-conditioning and ventilation · NCC 2019: J5.3
(1) A mechanical ventilation system, including one that is part of an air-conditioning system, except where the mechanical system serves only a Class 4 part of a building, must be capable of being deactivated when the building or part of the building served by that system is not occupied.
(2) When serving a conditioned space, except in periods when evaporative cooling is being used, a mechanical ventilation system must—
where specified in Table J6D4, have—
an energy reclaiming system that—
preconditions outdoor air at a minimum sensible heat transfer effectiveness of 60%; and
is capable of allowing outdoor air to bypass the heat reclaiming system when the conditions do not provide a heat reclaim benefit; or
indirect evaporative cooling that—
incorporates an energy reclaiming system meeting the requirements of (i); and
has a minimum humidification efficiency of 85%; or
demand control ventilation in accordance with AS 1668.2 if appropriate to the application; and
not exceed the minimum outdoor air quantity required by Part F6 by more than 20%, except—
when additional unconditioned outdoor air is supplied for free cooling; or
where additional mechanical ventilation is needed to balance the required exhaust or process exhaust; or
where an energy reclaiming system meeting the requirements of (2)(a)(i) preconditions all the outdoor air.
(3) An exhaust system with an air flow rate of more than 1000 L/s must be capable of stopping the motor when the system is not needed, except for an exhaust system in a sole-occupancy unit in a Class 3 or 9c building.
(4) A time switch must be provided to a mechanical ventilation system with an air flow rate of more than 1000 L/s.
(5) The time switch provided under (4) must—
be capable of switching electric power on and off at variable pre-programmed times and on variable pre-programmed days; and
have the ability to program public holidays at least 1 year ahead; and
be capable of being overridden by—
a demand-operated control; or
a manual switch; and
allow the resumption of normal operation no longer than 2 hours after any override is activated.
(6) The requirements of (2), (4) and (5) do not apply to a mechanical ventilation system that serves—
only one sole-occupancy unit in a Class 3 or 9c building; or
only a Class 4 part of a building.
(7) The requirements of (4) and (5) do not apply to—
a building where mechanical ventilation is needed for 24 hour occupancy; or
a carpark exhaust system; or
a mechanical ventilation system that is required to operate 24/7 to manage air contaminants, maintain pressurisation or the like.
Table J6D4 Required outdoor air treatment
Climate zone
Outdoor air flow (L/s)
Required measure - where demand control ventilation is appropriate
Required measure - where demand control ventilation is not appropriate
1
≤120
No required measure
No required measure
1
>120 to ≤2000
Modulating control
No required measure
1
>2000
Modulating control
Indirect evaporative cooling system
2
≤400
No required measure
No required measure
2
>400
Modulating control
No required measure
3
≤400
No required measure
No required measure
3
>400 to ≤2000
Modulating control
No required measure
3
>2000
Modulating control
Indirect evaporative cooling system
4
≤400
No required measure
No required measure
4
>400 to ≤500
Modulating control
No required measure
4
>500
Modulating control
Energy reclaiming system
5
≤400
No required measure
No required measure
5
>400 to ≤1000
Modulating control
No required measure
5
>1000
Modulating control
Energy reclaiming system
6
≤500
No required measure
No required measure
6
>500
Modulating control
Energy reclaiming system
7
≤250
No required measure
No required measure
7
>250
Modulating control
Energy reclaiming system
8
≤100
No required measure
No required measure
8
>100 to ≤250
Modulating control
No required measure
8
>250
Modulating control
Energy reclaiming system
Tables
Changed since NCC 2022. See NCC 2022 Volume One J6D4, or show what changed.
(1) General — A mechanical ventilation system, including one that is part of an air-conditioning system, except where the mechanical system serves only one sole-occupancy unit in a Class 2 building or serves only a Class 4 part of a building, must — be capable of being deactivated when the building or part of the building served by that system is not occupied; and when occupied. (2) When serving a conditioned space, except in periods when evaporative cooling is being used used, a mechanical ventilation system must — where specified in Table J6D4, have — an energy reclaiming system that — preconditions outdoor air at a minimum sensible heat transfer effectiveness of 60%; and is capable of allowing outdoor air to bypass the heat reclaiming system when the conditions do not provide a heat reclaim benefit; or indirect evaporative cooling that — incorporates an energy reclaiming system meeting the requirements of (i); and has a minimum humidification efficiency of 85%; or demand control ventilation in accordance with AS 1668.2 if … quantity required by Part F6 by more than 20%, except where — when additional unconditioned outdoor air is supplied for free cooling; or where additional mechanical ventilation is needed to balance the required exhaust or process exhaust; or where an energy reclaiming system meeting the requirements of (2)(a)(i) preconditions all the outdoor air; and for an airflow of more than 1000 L/s, have a variable speed fan unless the downstream airflow is required by Part F6 to be constant. (2) Exhaust systems — air. (3) An exhaust system with an air flow rate of more … an exhaust system in a sole-occupancy unit in a Class 2, 3 or 9c building. (3) Carpark exhaust systems — Carpark exhaust systems must have a control system in accordance with — clause 4.11.2 of AS 1668.2; or clause 4.11.3 of AS 1668.2. (4) Time switches — The following applies: A time switch must be provided to a mechanical ventilation system with an air flow rate of more than 1000 L/s. (5) The time switch provided under (4) must — be capable of switching electric power on and off at variable pre-programmed times and on variable pre-programmed days. days; and have the ability to program public holidays at least 1 year ahead; and be capable of being overridden by — a demand-operated control; or a manual switch; and allow the resumption of normal operation no longer than 2 hours after any override is activated. (6) The requirements of (a) (2), (4) and (b) (5) do not apply to — a mechanical ventilation system that serves — only one sole-occupancy unit in a Class 2, 3 or 9c building; or only a Class 4 part of a building; or building. (7) The requirements of (4) and (5) do not apply to — a building where mechanical ventilation is needed for 24 hour occupancy. occupancy; or a carpark exhaust system; or a mechanical ventilation system that is required to operate 24/7 to manage air contaminants, maintain pressurisation or the like. Table J6D4 Required outdoor air treatment Climate zone Outdoor air flow (L/s) Required measure - where demand control ventilation is appropriate Required measure - where demand control ventilation is not appropriate 1 >500 ≤120 No required measure No required measure 1 >120 to ≤2000 Modulating control No required measure 1 >2000 Modulating control Indirect evaporative cooling system 2 Not applicable ≤400 No required measure No required measure 2 >400 Modulating control No required measure 3 ≤400 No required measure No required measure 3 >400 to ≤2000 Modulating control No required measure 3 >2000 Modulating control Indirect evaporative cooling system 4 ≤400 No required measure No required measure 4 >400 to ≤500 Modulating control No required measure 4 >500 Modulating control Energy reclaiming system 5 ≤400 No required measure No required measure 5 >400 to ≤1000 Modulating control No required measure 5 >1000 Modulating control 4 and Energy reclaiming system 6 ≤500 No required measure No required measure 6 >500 Modulating control or energy reclaiming system 5 >1000 Modulating control or energy Energy reclaiming system 7 and ≤250 No required measure No required measure 7 >250 Modulating control Energy reclaiming system 8 ≤100 No required measure No required measure 8 >100 to ≤250 Modulating control No required measure 8 >250 Modulating control or energy Energy reclaiming system
Removed words are struck through; added words are highlighted. Comparison of the text only.