J4D6 Walls and glazing
Part J4 Building fabric · NCC 2019: J1.5
(1) The Total System U-Value of wall-glazing construction, including wall-glazing construction which wholly or partly forms the envelope internally, must not be greater than—
for a Class 2 common area, a Class 5, 6, 7, 8 or 9b building or a Class 9a building other than a ward area, U2.0; and
for a Class 3 or 9c building or a Class 9a ward area—
in climate zones 1, 3, 4, 6 or 7, U1.1; or
in climate zones 2 or 5, U2.0; or
in climate zone 8, U0.9.
(2) The Total System U-Value of display glazing must not be greater than U5.8.
(3) The Total System U-Value of wall-glazing construction must be calculated in accordance with Specification 37.
(4) Wall components of a wall-glazing construction must achieve a minimum Total R-Value of—
where the wall is less than 80% of the area of the wall-glazing construction, R1.0; or
where the wall is 80% or more of the area of the wall-glazing construction, the value specified in Table J4D6a.
(5) The solar admittance of externally facing wall-glazing construction, excluding wall-glazing construction which is wholly internal, must not be greater than—
for a Class 2 common area, a Class 5, 6, 7, 8 or 9b building or a Class 9a building other than a ward area, the values specified in Table J4D6b; and
for a Class 3 or 9c building or a Class 9a ward area, the values specified in Table J4D6c.
(6) The solar admittance of a wall-glazing construction must be calculated in accordance with Specification 37.
(7) The Total system SHGC of display glazing must not be greater than 0.81 divided by the applicable shading factor specified in S37C7.
Table J4D6a Minimum wall Total R-Value - Wall area 80% or more of wall-glazing construction area
Climate zone
Class 2 common area, Class 5, 6, 7, 8 or 9b building or a Class 9a building other than a ward area
Class 3 or 9c building or Class 9a ward area
1
2.4
3.3
2
1.4
1.4
3
1.4
3.3
4
1.4
2.8
5
1.4
1.4
6
1.4
2.8
7
1.4
2.8
8
1.4
3.8
Table J4D6b Maximum wall-glazing construction solar admittance - Class 2 common area, Class 5, 6, 7, 8 or 9b building or Class 9a building other than a ward area
Climate zone
Eastern aspect solar admittance
Northern aspect solar admittance
Southern aspect solar admittance
Western aspect solar admittance
1
0.12
0.12
0.12
0.12
2
0.13
0.13
0.13
0.13
3
0.16
0.16
0.16
0.16
4
0.13
0.13
0.13
0.13
5
0.13
0.13
0.13
0.13
6
0.13
0.13
0.13
0.13
7
0.13
0.13
0.13
0.13
8
0.2
0.2
0.42
0.36
Table J4D6c Maximum wall-glazing construction solar admittance - Class 3 or 9c building or Class 9a ward area
Climate zone
Eastern aspect solar admittance
Northern aspect solar admittance
Southern aspect solar admittance
Western aspect solar admittance
1
0.07
0.07
0.10
0.07
2
0.10
0.10
0.10
0.10
3
0.07
0.07
0.07
0.07
4
0.07
0.07
0.07
0.07
5
0.10
0.10
0.10
0.10
6
0.07
0.07
0.07
0.07
7
0.07
0.07
0.08
0.07
8
0.08
0.08
0.08
0.08
Tables
- Table J4D6a Minimum wall Total R-Value - Wall area 80% or more of wall-glazing construction area
- Table J4D6b Maximum wall-glazing construction solar admittance - Class 2 common area, Class 5, 6, 7, 8 or 9b building or Class 9a building other than a ward area
- Table J4D6c Maximum wall-glazing construction solar admittance - Class 3 or 9c building or Class 9a ward area
Changed in NCC 2025. See NCC 2025 Volume One J4D6, or show what changed.
(1) The Total System U-Value of wall-glazing construction, including wall-glazing construction which wholly or partly forms the envelope internally, must not be greater than — for a Class 2 common area, a Class 5, 6, 7, 8 or 9b building or a Class 9a building other than a ward area, U2.0; and for a Class 3 or 9c building or a Class 9a ward area — the values specified in climate zones 1, 3, 4, 6 or 7, U1.1; or in climate zones 2 or 5, U2.0; or in climate zone 8, U0.9. Table J4D6a. (2) The Total System U-Value of glazing, including display glazing glazing, must not be greater than U5.8. (3) The Total System … area of the wall-glazing construction, the value specified in Table J4D6a. J4D6b. (5) The solar admittance of externally facing wall-glazing construction, excluding … internal, must not be greater than — for a Class 2 common area, a Class 5, 6, 7, 8 or 9b building or a Class 9a building other than a ward area, the values specified in Table J4D6b; J4D6c; and for a Class 3 or 9c building or a Class 9a ward area, the values specified in Table J4D6c. J4D6d. (6) The solar admittance of a wall-glazing construction must be … (7) The Total system SHGC of display glazing must not be greater than exceed the lesser of the following: 0.81 divided by the applicable shading factor specified in S37C7. 1. Table J4D6a Maximum Total System U-Value of wall-glazing construction Climate zone Class 5, 6, 7, 8, 9b building or a Class 9a building other than a ward area Class 3 or 9c building or a Class 9a ward area 1 1.6 1.1 2 1.9 1.6 3 1.7 1.2 4 1.7 1.3 5 1.9 1.6 6 1.8 1.6 7 1.7 1.2 8 2.0 1.1 Table J4D6b Minimum wall Total R-Value - Wall area 80% or more of wall-glazing construction area Climate zone Class 2 common area, Class 5, 6, 7, 8 or 9b building or a … 3 or 9c building or Class 9a ward area 1 3.0 4.0 2 1.0 1.0 3 2.2 2.4 3.3 2 1.4 1.4 3 1.4 3.3 4 1.4 2.8 2.0 1.9 5 1.4 1.4 1.0 1.0 6 1.4 2.8 1.2 1.0 7 1.4 2.8 2.2 2.2 8 1.4 3.8 3.6 3.6 Table J4D6b J4D6c Maximum wall-glazing construction solar admittance - Class 2 common area, Class 5, 6, 7, 8 or 9b building or Class … admittance Southern aspect solar admittance Western aspect solar admittance 1 0.12 0.12 0.12 0.12 2 0.13 0.13 0.13 0.13 3 0.16 0.16 0.16 0.16 4 0.13 0.13 0.13 0.13 5 0.13 0.13 0.13 0.13 6 0.13 0.13 0.13 0.13 to 7 0.13 0.13 0.13 0.13 0.10 0.09 0.11 0.09 8 0.2 0.2 0.42 0.36 0.10 0.10 0.20 0.10 Table J4D6c J4D6d Maximum wall-glazing wall glazing construction solar admittance - Class 3 or 9c building or … solar admittance Southern aspect solar admittance Western aspect solar admittance 1 0.07 0.07 0.10 0.07 2 0.10 0.10 0.10 0.10 3 0.07 0.07 0.07 0.07 4 0.07 0.07 0.07 0.07 5 0.10 0.10 0.10 0.10 6 0.07 0.07 0.07 0.07 7 0.07 0.07 0.08 0.07 8 0.08 0.08 0.08 0.08 All 0.06 0.06 0.06 0.06
Removed words are struck through; added words are highlighted. Comparison of the text only.