- H1O1 ObjectiveThe Objective is to— safeguard people from injury caused by structural failure; and safeguard people from loss of amenity caused by structural…
- H1F1 Functional StatementsA building or structure is to withstand the combination of loads and other actions to which it may be reasonably subjected. (2) Glazing is to be…
- H1P1 Structural reliability and resistanceBy resisting the actions to which it may reasonably be expected to be subjected, a building or structure, during construction and use, with…
- H1P2 Buildings in flood areas QLD SAA building in a flood hazard area must be designed and constructed, to the degree necessary, to resist flotation, collapse or significant permanent…
- Table H1V1a Annual action modelsDesign action | Ratio of mean action to nominal | Coefficient of variation of the action Permanent action | Imposed action | Wind action…
- Table H1V1b Annual target reliability indices (β)Type of action | Target reliability index β Permanent action | 4.3 Imposed action | 4.0 Wind, snow and earthquake action | 3.7 Table Notes Table…
- H1V1 Structural reliabilityThis Verification Method is only applicable to components with a resistance coefficient of variation of at least 10% and not more than 40%. (2) For…
- H1V2 Structural robustnessCompliance with H1P1(1)(c) is verified for structural robustness if (2) and (3) are complied with. (2) The structure is assessed such that the…
- H1D1 Deemed-to-Satisfy ProvisionsWhere a Deemed-to-Satisfy Solution is proposed, Performance Requirements H1P1 and H1P2 are satisfied by complying with H1D2 to H1D11. (2) Where a…
- H1D2 Structural provisionsA Class 1 or Class 10 building must be constructed in accordance with— Section 2 of the ABCB Housing Provisions; or the relevant provisions of H1D3…
- H1D3 Site preparation QLDPerformance RequirementH1P1 is satisfied for earthworks associated with the construction of a building or structure if they are in accordance with…
- H1D4 Footings and slabs NSWPerformance RequirementH1P1 is satisfied for the design and construction of footings and slabs if they comply with either (a) or (b): One of the…
- H1D5 MasonryPerformance RequirementH1P1 is satisfied for masonry veneer if it is designed and constructed in accordance with— AS 3700; or AS 4773.1 and AS…
- Table H1D6a Effective load width for structural steel bearers and strutting beams—Single spanning rafter or joistDesign member | Member 1 | Member 2 Effective load width | 0.5 x Span 1 | 0.5 x (Span 1 + Span 2)
- Table H1D6b Effective load width for structural steel bearers and strutting beams—Continuous spanning rafter or joistDesign Member | Member 1 | Member 2 | Member 3 Effective load width | 0.4 x Span 1 | 0.6 x (Span 1 + Span 2) | 0.5 x (Span 2) + Span 3 Table Notes…
- H1D6 Framing QLDDiagrams depicting framing members and associated terminology used to describe them are set out in Figures H1D6c, H1D6d and H1D6e, and in most cases…
- Table H1D7 Low-High-Low pressure sequenceSequence | Number of cycles | Load A | 4500 | 0 to 0.45 Pt B | 600 | 0 to 0.6 Pt C | 80 | 0 to 0.8 Pt D | 1 | 0 to 1.0 Pt E | 80 | 0 to 0.8 Pt F |…
- H1D7 Roof and wall cladding WADiagrams depicting relevant roofing and supporting members and associated terminology used to describe them are set out in Figure H1D7a and Figure…
- H1D8 GlazingPerformance RequirementH1P1 is satisfied for glazing and windows if they are— designed and constructed in accordance with AS 2047 for glazed…
- H1D9 Earthquake areasPerformance RequirementH1P1 for Class 1 and 10 buildings constructed in areas subject to seismic activity is satisfied if the building is…
- H1D10 Flood hazard areas QLD VICPerformance RequirementH1P2 for a Class 1 building constructed in a flood hazard area is satisfied if the building is constructed in accordance with…
- H1D11 Attachment of framed decks and balconies to external walls of buildings using a waling platePerformance RequirementH1P1 is satisfied for the attachment of a deck or balcony to an external wall if it complies with Part 12.3 of the ABCB…
- H1D12 Piled footingsPerformance RequirementH1P1 is satisfied for piled footings if they are designed and installed in accordance with AS 2159.