Deemed-to-Satisfy Provision · NCC 2022 Volume Three
C2D2 Invert levels
Part C2 Sanitary drainage systems · NCC 2019: C2.2
The invert level of a trap or gully weir must be a minimum of 10 mm higher than the soffit of the pipe to which it connects.
Same wording in NCC 2025 Volume Three. See NCC 2025 Volume Three C2D2.