Table · ABCB Housing Provisions 2022

Table 1 Alpine areas where snow loads are significant

Glossary

Open Table 1 on NCC Online ↗
LocationMap identifier
Kiandra (NSW)1
Mount Kosciuszko (NSW)2
Perisher Valley (NSW)3
Thredbo (NSW)4
Cabramurra (NSW)5
Charlotte Pass Village (NSW)6
Diggers Creek (NSW)7
Guthega Village (NSW)8
Mount Blue Cow (NSW)9
Mount Selwyn (NSW)10
Perisher Range (NSW)11
Rules Point (NSW)12
Sawpit Creek (NSW)13
Smiggin Holes (NSW)14
Smiggin Range (NSW)15
Three Mile Dam (NSW)16
Wilsons Valley (NSW)17
Falls Creek (Vic.), including Summit Area, Sun Valley and Village Bowl18
Mount Baw Baw (Vic.)19
Mount Buffalo (Vic.), including Chalet, Dingo Dell and Tatra20
Mount Buller (Vic.), including Baldy and Village21
Mount Hotham (Vic.), including Davenport and Village Centre22
Dinner Plain (Vic.)23
Lake Mountain (Vic.)24
Mount Stirling (Vic.)25
Ben Lomond Ski Field (Tas.)26
Cradle Valley (Tas.)27
Great Lake Area (Tas.)28
Mount Field Ski Field (Tas.)29
ReferenceChanges and Commentary
ThroughoutA “Scope” and “Application” has been added to each Section of the ABCB Housing Provisions. This sets out the conditions and limitations applicable to the subsequent Parts within that Section.
ThroughoutA number of provisions have been amended, restructured, deleted and relocated as part of the initiative to provide a consistent NCC structure and improve NCC usability.
3.3.3Amended as a consequence of including new Livable housing design requirements in Part H8 of Volume Two.
Section 4Amendments, including insertion of new provisions, tables, diagrams and grouping provisions, have been made to reflect current practice, improve readability and structure. The construction of footings and slabs has been reduced to a certain geometric size and the applicability to soil classifications is restricted to Class A, S and M sites.
4.2.11The requirement for reinforcing re-entrant corners moved from 2019: 3.2.5.3 to this clause as part of steel reinforcement requirements. Explanatory information has also been provided.
4.2.20A new provision has been added for localised thickening for footings or slabs supporting concentrated loads.
4.2.22A new provision has been added for recesses in slabs.
5.1A new provision has been inserted as a consequence to new clauses 5.7.3 and 5.7.4.
5.2.4A new provision has been inserted as a consequence to new clauses 5.7.3 and 5.7.4.
5.2.5A new provision has been added as a consequence to new clause 5.6.8.
5.3A new Part has been added and contains provisions related to cavity masonry.
5.4A new Part has been added and contains provisions related to unreinforced single leaf masonry.
5.5The Part has been re-named to ‘Isolated piers’ and contains content in Part 3.3.6 of Volume Two 2019 Amendment 1.
5.6A new Part, ‘Masonry components and accessories’ has been added and incorporates some content from Part 3.3.5 of Volume Two 2019 Amendment 1. It includes amendments and new provisions to reflect current practice, improve readability and structure.
5.6.6New explanatory information has been added to Figure 5.6.6c referenced in clause 5.6.6 to guide designs for roof tie-down over openings greater than 1200 mm wide in masonry construction.
5.7A new Part ‘Weatherproofing for masonry’ has been added and incorporates some content from Part 3.3.5 of Volume Two 2019 Amendment 1. It includes amendments and new provisions to reflect current practice, improve readability and structure.
5.7.6A new provision has been added for waterproofing for single leaf masonry walls to compliment new Part 5.4.
6.3Amendments for structural steel members, including insertion of new tables, diagrams and explanatory information, have been made to improve readability and structure.
6.3.3A new provision has been added for steel bearers as part of the restructure of Section 6—Framing.
6.3.4A new provision has been added for steel strutting beams as part of the restructure of Section 6—Framing.
6.3.5A new provision has been added for steel lintels as part of the restructure of Section 6—Framing.
6.3.6A new provision has been added for steel columns as part of the restructure of Section 6 —Framing.
6.3.7A new provision has been added providing details for fixings and bearing for structural steel members. This includes additional figures for various fixing details.
6.3.8A new provision has been added providing details for cuts and penetrations through structural steel members.
6.3.9Tables relating to protective coatings for steelwork have been changed to provide greater detail and additional options for corrosion protection.
7.2.8Amended to require sheets overhang not less than 50 mm where an eaves gutter is provided.
7.4Amendments, including insertion of new tables, diagrams and explanatory information, have been made to reflect current practice, improve readability and structure. The amendments also align annual exceedance probability figures with AS 3500.3-2021 replacing average recurrence interval figures.
Tables 7.5.2, 7.5.3a and 7.5.3bTable note has been amended to refer base metal thickness of steel framing members to that required for a roof batten in NASH Standard.
8.2Part 8.2 has been re-named, groups provisions relevant to windows and external glazed doors and contains amendments, including insertion of new tables, diagrams and explanatory information, to improve readability and structure.
8.2.2A new provision has been added for the installation of windows.
8.3.3Amended to reflect new terminology ‘monolithic’ in lieu of ‘ordinary’ to reflect current practice.
8.4A new Part has been added, re-named and groups provisions relevant to glazing human impact and contains amendments, including insertion of new tables, diagrams and explanatory information to improve readability and structure.
8.4.6Amended to include provisions for mirrors and splashbacks.
8.4.8A new provision has been added for the identification of safety glass.
9.2.9Amendments have been made to clarify application of allowable encroachments.
10.2Amendments, including insertion of new Deemed-to-Satisfy Provisions, tables, diagrams and explanatory information, have been made to reflect current practice, improve readability and structure.
10.2.2Amended to require walls in shower areas to be waterproof to not less than 1800 mm above the floor substrate.
10.2.5A new sub-clause has been added for WCs with handheld bidet spray installations.
10.2.6A new provision has been added for waterproofing systems distinguishing how systems are deemed either waterproof or water resistant.
10.2.7A new provision has been added stating materials used in wet areas must be either waterproof or water resistant.
10.2.8A new provision has been added setting out what materials used in waterproofing systems are deemed to be waterproof.
10.2.9A new provision has been added setting out materials deemed to be water resistant for wall and floor substrates.
10.2.10A new provision has been added setting out materials deemed to be water resistant for wall and floor surface materials.
10.2.11A new provision has been added setting out the relevant Part to be complied with for wall and floor substrates in wet areas.
10.2.12A new provision has been added for falls to wet area floors.
10.2.13A new provision has been added setting out the relevant Part to be complied with for wall and floor surface materials in wet areas.
10.2.14A new provision has been added for shower area requirements.
10.2.15A new provision has been added for step-down showers.
10.2.16A new provision has been added for the hob construction of showers.
10.2.17A new provision has been added for enclosed showers with level threshold.
10.2.18A new provision has been added for unenclosed showers.
10.2.19A new provision has been added for preformed shower bases.
10.2.20A new provision has been added for baths and spas.
10.2.21A new provision has been added relating to the membrane installation for screeds and location of tiles.
10.2.22A new provision has been added for the substrate surface preparation where membranes are to be applied.
10.2.23A new provision has been added for the treatment of penetrations within shower areas.
10.2.24A new provision has been added relating to the installation of flashings and treatment of junctions including vertical and horizontal legs at perimeters.
10.2.25A new provision has been added for the application of shower area floor membranes.
10.2.26A new provision has been added relating to shower area membrane requirements for wall sheeting substrates.
10.2.27A new provision has been added relating to the installation of bond b

General

Section 3—Site preparation

Section 4—Footings and slabs

Section 5—Masonry

Section 6—Framing

Section 7—Roof and wall cladding

Section 8—Glazing

Section 9—Fire safety

Section 10—Health and amenity

Changed in NCC 2025. See ABCB Housing Provisions 2025 Table 1, or show what changed.

Location | Map identifier Kiandra (NSW) | 1 Mount Kosciuszko … Field Ski Field (Tas.) | 29 Reference | Changes and Commentary General Throughout | A “Scope” and “Application” has been added to each commentary Section of the ABCB Housing Provisions. This sets out the conditions and limitations applicable to the subsequent Parts within that Section. Throughout | A number of provisions have been amended, restructured, deleted and relocated as part of the initiative to provide a consistent NCC structure and improve NCC usability. Section 3 —Site preparation 3.3.3 2 —Structure Table 2.2.3b | Amended as a consequence of including new Livable housing design requirements in Part H8 of Volume Two. to reflect revised wind regions. Figure 2.2.3 | Amended to reflect revised wind regions. 2.2.4(q) | Amended to include wind region B2. Section 4 —Footings and slabs 4.2.22 | Amended to clarify the required specification for recessed areas. Section 4 9 —Fire safety 9.2.8(b) | Amendments, including insertion Amended to clarify location of ‘another building’. Also, introduced use of new provisions, tables, diagrams defined term ‘allotment’. 9.2.9 | Amended to utilise new defined term ‘allotment’. 9.2.9(3) | Open carports introduced as an allowable encroachment. Section 10 —Health and grouping provisions, amenity 10.2.9 | Amended to clarify provisions regarding fibre cement sheeting. 10.2.14 | Clarification amendments. 10.3.1(f) | Amended to clarify that the provision does not apply to threshold ramps. 10.6.2 | Amended to provide exemption for certain rooms and spaces. 10.8.1 | Amended to provide further membrane vapour permeance specifications, dependent on wall construction, and further details for cavity construction. 10.8.3 | In NCC 2022, 10.8.3 applied to all roof spaces. In NCC 2025, 10.8.3 is amended and applies to roof spaces where the primary insulation layer is not parallel to the roof plane. 10.8.4 | Added to specify requirements for roof spaces where the primary insulation layer is parallel to the roof plane. Section 11 —Safe movement and access 11.2.3(c) | Concessions have been made introduced for threshold ramps, step ramps and kerb ramps. 11.2.4(3) | Amended to reflect current practice, improve readability and structure. The construction of footings and slabs has been reduced to a certain geometric size and the applicability to soil classifications is restricted to Class A, S and M sites. 4.2.11 | The requirement provide concession for reinforcing re-entrant corners moved from 2019: 3.2.5.3 to this clause as part of steel reinforcement requirements. Explanatory information has also been provided. 4.2.20 threshold ramps. 11.2.7 | A new provision has been added included to permit fixed platforms, walkways, stairways and ladders for localised thickening for footings or slabs supporting concentrated loads. 4.2.22 | A new provision has been added for recesses in slabs. Section 5 —Masonry 5.1 | A new provision has been inserted as a consequence Class 10b structures to new clauses 5.7.3 and 5.7.4. 5.2.4 | A new provision has been inserted as a consequence to new clauses 5.7.3 and 5.7.4. 5.2.5 | A new provision has been added as a consequence to new clause 5.6.8. 5.3 | A new Part has been added and contains provisions related to cavity masonry. 5.4 | A new Part has been added and contains provisions related to unreinforced single leaf masonry. 5.5 | The Part has been re-named to ‘Isolated piers’ and contains content in Part 3.3.6 of Volume Two 2019 Amendment 1. 5.6 | A new Part, ‘Masonry components and accessories’ has been added and incorporates some content from Part 3.3.5 of Volume Two 2019 Amendment 1. It includes amendments and new provisions to reflect current practice, improve readability and structure. 5.6.6 | New explanatory information has been added to Figure 5.6.6c referenced in clause 5.6.6 to guide designs for roof tie-down over openings greater than 1200 mm wide in masonry construction. 5.7 | A new Part ‘Weatherproofing for masonry’ has been added and incorporates some content from Part 3.3.5 of Volume Two 2019 Amendment 1. It includes amendments and new provisions to reflect current practice, improve readability and structure. 5.7.6 | A new provision has been added for waterproofing for single leaf masonry walls to compliment new Part 5.4. Section 6 —Framing 6.3 | Amendments for structural steel members, including insertion of new tables, diagrams and explanatory information, have been made to improve readability and structure. 6.3.3 | A new provision has been added for steel bearers as part of the restructure of Section 6 —Framing. 6.3.4 | A new provision has been added for steel strutting beams as part of the restructure of Section 6 —Framing. 6.3.5 | A new provision has been added for steel lintels as part of the restructure of Section 6 —Framing. 6.3.6 | A new provision has been added for steel columns as part of the restructure of Section 6 —Framing. 6.3.7 | A new provision has been added providing details for fixings and bearing for structural steel members. This includes additional figures for various fixing details. 6.3.8 | A new provision has been added providing details for cuts and penetrations through structural steel members. 6.3.9 | Tables relating to protective coatings for steelwork have been changed to provide greater detail and additional options for corrosion protection. Section 7 —Roof and wall cladding 7.2.8 | Amended to require sheets overhang not less than 50 mm where an eaves gutter is provided. 7.4 | Amendments, including insertion of new tables, diagrams and explanatory information, have been made to reflect current practice, improve readability and structure. The amendments also align annual exceedance probability figures comply with AS 3500.3-2021 replacing average recurrence interval figures. Tables 7.5.2, 7.5.3a and 7.5.3b | Table note has been amended to refer base metal thickness of steel framing members to that required for a roof batten in NASH Standard. Section 8 —Glazing 8.2 | Part 8.2 has been re-named, groups provisions relevant to windows and external glazed doors and contains amendments, including insertion of new tables, diagrams and explanatory information, to improve readability and structure. 8.2.2 | A new provision has been added for the installation of windows. 8.3.3 | Amended to reflect new terminology ‘monolithic’ 1657 in lieu of ‘ordinary’ to reflect current practice. 8.4 | A new Part has been added, re-named and groups provisions relevant to glazing human impact and contains amendments, including insertion of new tables, diagrams and explanatory information to improve readability and structure. 8.4.6 | Amended to include provisions for mirrors and splashbacks. 8.4.8 | A new provision has been added for the identification of safety glass. Section 9 —Fire safety 9.2.9 | Amendments have been made to clarify application of allowable encroachments. Section 10 —Health and amenity 10.2 | Amendments, including insertion of new Deemed-to-Satisfy Provisions, tables, diagrams and explanatory information, have been made to reflect current practice, improve readability and structure. 10.2.2 | Amended to require walls in shower areas to be waterproof to not less than 1800 mm above the floor substrate. 10.2.5 11.2. 11.3.3(2)(c) | A new sub-clause has been added included to permit fixed platforms, walkways, stairways and ladders for WCs Class 10b structures to comply with handheld bidet spray installations. 10.2.6 AS 1657 in lieu of 11.3.3. 11.3.5(2)(d) | A new provision sub-clause has been added included to permit handrails for waterproofing systems distinguishing how systems are deemed either waterproof or water resistant. 10.2.7 stairways and ladders to comply with AS 1657 in lieu of 11.3.5. Section 13 —Energy efficiency 13.2.5 | Amended to allow for overhangs greater than those specified in NCC 2022. 13.2.6 | Amended to clarify application for waffle pod slabs. Schedule 1 —Definitions Abbreviations | Diameter Nominal (DN) has been added. Symbols | Carbon dioxide equivalent per square metre hour (CO2-e/m2.hr) has been added. Symbols | Watt peak per meter squared output of a solar photovoltaic panel (Wp/m2) has been added. Allotment | A new provision defined term, ‘allotment’, has been added stating materials used in wet areas must be either waterproof or water resistant. 10.2.8 added. Ancillary components | A defined term, ‘ancillary components’, has been added. Cavity | The defined term ‘cavity’ has been amended to cover additional wall types. Climate specific art load value | A new provision defined term, ‘climate specific part load value’, has been added setting out what materials used in waterproofing systems are deemed to be waterproof. 10.2.9 added. Figure 2 | Figure 2 has been updated. Collected | A new provision defined term, ‘collected’, has been added setting out materials deemed added. Combustible | The defined term ‘combustible’ has been amended to require that determination using AS 1530.1 is to be water resistant undertaken by an Accredited Testing Laboratory. A transition period has been included for wall this amendment. Condensation | The defined term ‘condensation’ has been amended to replace ‘moisture’ with ‘liquid water’. Control layer | A defined term, ‘control layer’, has been added. Critical radiant flux | The defined term ‘critical radiant flux’ has been amended to require that determination using AS ISO 9239.1 is to be undertaken by an Accredited Testing Laboratory. A transition period has been included for this amendment. Table 4 | Amended to reflect updated wind classes B1 and floor substrates. 10.2.10 B2. Drainage system | A new provision defined term, ‘drainage system’, has been added setting out materials deemed added. Drained | A defined term, ‘drained’, has been added. Envelope | The defined term ‘envelope’ has been amended. Fire hazard properties | The defined term ‘fire hazard properties’ has been amended to be water resistant for wall and floor surface materials. 10.2.11 align methods of determination. Fire protected steel | A new provision defined term, ‘fire-protected steel’, has been added setting out added. Fire-source feature | The defined term ‘fire-source feature’ has been amended to include the relevant Part construction edge or perimeter of another building on the allotment, which is not a Class 10 building, which has a use that constitutes a fire load. Flammability index | The defined term ‘flammability Index’ has been amended to require that determination using AS 1530.2 is to be complied with made by an Accredited Testing Laboratory. A transition period has been included for wall and floor substrates in wet areas. 10.2.12 this amendment. Kerb ramp | A new provision defined term, ‘kerb ramp’, has been added added. Mezzanine | The defined term ‘mezzanine’ has been amended for falls clarity. Non-combustible | The defined term ‘non-combustible’ has been amended to wet require that determination using AS 1530.1 is to be made by an Accredited Testing Laboratory. A transition period has been included for this amendment. Occupiable outdoor area floors. 10.2.13 | Explanatory information has been provided to assist with interpretation. Point of connection | The defined term, ‘Point of connection’, has been amended to incorporate rainwater storage. Rainwater | A new provision defined term, ‘rainwater’, has been added setting out the relevant Part to be complied with for wall and floor surface materials in wet areas. 10.2.14 added. Redirected | A new provision defined term, ‘redirected’, has been added for shower area requirements. 10.2.15 added. Rising damp | A new provision defined term, ‘rising damp’, has been added for step-down showers. 10.2.16 added. Self-draining | A new provision defined term, ‘self-draining’, has been added added. Small sized, low-speed automatic lift | The defined term ‘small sized, low-speed automatic lift’ has been deleted. Smoke-Developed Index | The defined term ‘Smoke-Developed Index’ has been amended to require that determination using AS/NZS 1530.3 is to be made by an Accredited Testing Laboratory. A transition period has been included for the hob construction of showers. 10.2.17 this amendment. Smoke development rate | The defined term ‘smoke development rate’ has been amended to require that determination using AS ISO 9239.1 is to be made by an Accredited Testing Laboratory. A transition period has been included for this amendment. Solar Reflectance Index | A new provision defined term, ‘Solar Reflectance Index’, has been added added. Spread-of-Flame Index | The defined term ‘Spread-of-Flame Index’ has been amended to require that determination using AS 1530.3 is to be made by an Accredited Testing Laboratory. A transition period has been included for enclosed showers with level threshold. 10.2.18 this amendment. Step ramp | A new provision defined term, ‘step ramp’, has been added for unenclosed showers. 10.2.19 added. Stormwater | A new provision defined term, ‘stormwater’, has been added for preformed shower bases. 10.2.20 added. Structural substrate | A new provision defined term, ‘structural substrate’, has been added for baths and spas. 10.2.21 added. Sub-surface water | A new provision defined term, ‘sub-surface water’, has been added relating to the membrane installation for screeds and location of tiles. 10.2.22 added. Surface finish | A new provision defined term, ‘surface finish’, has been added added. Surface water | The defined term ‘surface water’ has been amended for the substrate surface preparation where membranes are to be applied. 10.2.23 clarity. Surface water seepage | A new provision defined term, ‘surface water seepage’, has been added for the treatment of penetrations within shower areas. 10.2.24 added. Threshold ramp | A new provision defined term, ‘threshold ramp’, has been added relating to the installation of flashings and treatment of junctions including vertical and horizontal legs at perimeters. 10.2.25 added. Total Solar Reflectance | A new provision defined term, ‘Total Solar Reflectance (TSR)’, has been added for the application of shower area floor membranes. 10.2.26 added. Water | A new provision defined term, ‘water’, has been added relating to shower area membrane requirements for wall sheeting substrates. 10.2.27 added. Water services overflow | A new provision defined term, ‘water services overflow’, has been added relating to added. Schedule 2 —Referenced Documents AS ISO 717 Part 1 | The 2024 edition of AS ISO 717 Part 1 ‘Acoustics — Rating of sound insulation in buildings and of building elements — Airborne sound insulation’ has been referenced. The associated note (Note 1) has been updated accordingly. AS ISO 717 Part 2 | The 2024 edition of AS ISO 717 Part 2 ‘Acoustics — Rating of sound insulation in buildings and of building elements — Impact sound insulation’ has been referenced. AS/NZS 1170 Part 2 | Amdts 1 and 2 of the installation 2021 edition of bond b AS/NZS 1170 Part 2 ‘Structural design actions — Wind actions’ have been referenced. AS 1170 Part 4 | The 2024 edition of AS 1170 Part 4 ‘Structural design actions — Earthquake actions in Australia’ has been referenced. AS 1530 Part 1 | The 2024 edition of AS/NZS 1530 Part 1 ‘Methods for fire tests on building materials, components and structures — Combustibility test for materials (ISO 1182:2020, NEQ)’ has been referenced. A note concerning existing tests (Note

Removed words are struck through; added words are highlighted. Comparison of the text only.

Clauses referred to